Abstract
Fast movement along a predefined path is important for many robot applications, especially in cluster tool robots, requires utilization of the maximum allowable torque range. Robot running along the time-optimal path brings many benefits such as higher productivity. In this paper, moving a delicate object from an initial point to a specified location along a predefined path within the minimum time under a damage-free condition is studied. To achieve this goal, the dynamics of robot is first described as the formulation using arc differential of the predefined path in Cartesian coordinates. Then, the range of acceleration is deducted from the torque limitations, and the method of computing the maximum and minimum acceleration is given. This range can be modified by consideration of the geometrical constraints. Considering the torque constraint on the object, the range of maximum acceleration and velocity are obtained to preserve object safety while the manipulator is carrying it along the curved path. After that, a method to solve the time-optimal problem is presented, and the detailed process is explained. In this way time-optimal trajectory is planned within the maximum allowable range of acceleration and velocity. This algorithm is implemented on a 2-arm, 2-dof cluster tool robot and its validity is proven by simulation result.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.