Abstract
AbstractResupply of Australia’s Antarctic station Casey relies on the movement of heavy cargo over land from the wharf to the station. The road consists of gravel that is deposited seasonally over 2–3 m of perennial ice. However, ongoing maintenance of this road is unsustainable because local sourcing of gravel will soon be prohibited. Therefore, alternative resupply options were investigated. Bridging solutions are available to span problematic sections of the road; however, sections of unbridged road will remain, requiring ongoing maintenance. Therefore, implementation of a passive, thermally isolated road over the existing or similar road alignment is recommended. Gravel may still be required in the initial construction of such a road; however, it would be contained and not need replenishment. Measures can be implemented in an iterative manner to ensure that the resupply of Casey Station continues in a cost-effective and environmentally sustainable manner.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.