Abstract

The difficult task of locating and quantifying nonaqueous phase liquids (NAPLs) present in the vadose and saturated zones has prompted the development of innovative, nondestructive characterization techniques. The use of the interwell partitioning tracer`s (IWPT) test, in which tracers that partition into the NAPL phase are displaced through the aquifer, is an attractive alternative to traditional coring and analysis. The first field test of IWPT was conducted in a hydraulically isolated test cell to quantify the total amount of a complex NAPL (a mixture of JP-4 jet fuel and chlorinated solvents) trapped within a 1.5-m smear zone in a shallow, unconfined sand and gravel aquifer at Hill Air Force Base (AFB), Utah. Tracer breakthrough curves (BTCs) were measured in three extraction wells (EWs) following a tracer pulse introduction through four injection wells (IWs). The measured retardation of the partitioning tracer (2,2-dimethyl-3-pentanol) relative to the nonreactive tracer (bromide) was used to quantify the NAPL present. The EW data were used to estimate an average NAPL saturation of 4.6--5.4% within the test cell. NAPL saturations estimated by using measured concentrations in soil cores of two significant compounds present in the NAPL were 3.0 and 4.6%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.