Abstract

In this chapter, three PSO based methods: Original PSO, Evolutionary PSO, and Adaptive PSO are compared for optimal operational planning problems of energy plants, which are formulated as Mixed-Intger Nonlinear Problems (MINLPs). The three methods are compared using typical energy plant operational planning problems. We have been developed an optimal operational planning and control system of energy plants using PSO (called FeTOP). FeTOP has been actually introduced and operated at three factories of one of the automobile company in Japan and realized 10% energy reduction compared with operators’ operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.