Abstract

This paper considers the problem of scheduling batches of parts in a multi-cell flexible manufacturing system (MCFMS) with sequence dependent batch setup time. The goal is to find the best sequence of batches and hence to minimise the makespan. Two mathematical models are developed namely: batch availability model and job availability model. As the problem is known to be NP-hard, particle swarm optimisation (PSO) algorithm and multi-start simulated annealing (MSA) algorithm are proposed to solve the problem. The proposed algorithms are validated by testing the benchmark problems available in the literature. In addition to that, 80 problems with various sizes have been generated at random and then the performance of the proposed MSA and PSO algorithms are compared with CPLEX solver. The experimental results show that MSA provides better solution compared with PSO, the same solution as CPLEX and very close to the lower bound value provided by CPLEX.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.