Abstract
An underground cable is often used as the interface between an overhead line and a substation where it is impractical to obtain an overhead right of way or to avoid environmentally sensitive areas. The transition from an overhead line to the underground cable usually takes place at cable sealing end compounds or transition stations. At the moment there is not adequate information in the national as well international standards on safety at these installations. This paper describes the earthing assessment of a 132 kV cable sealing end compound. A fault transfer phenomenon at the cable sealing end compound is discussed and simulated using the computer method. It is demonstrated that cable sealing end compounds can exhibit higher earth potential rise (EPR) for either end substation fault instead transitions points fault when such faults are fed by a combination of overhead line and underground cable. The analysis steps presented in this paper can be used as a guide for future works within this area.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.