Abstract
The nature of input materials is changed as long as the product reaches the consumer in many types of manufacturing processes. In designing and improving multi-stage systems, the study of the steps separately may not lead to the greatest possible improvement in the whole system, therefore the study of inputs and outputs of each stage can be effective in improving the output quality characteristics. In this study, the double sampling method is applied for inspection where decision variables are the sample size per sampling time and the maximum amount of defective items in the first and second samples in each stage. Furthermore, uncertainty in parameters such as production, inspection, and replacement costs are included in the objective function and handled by a Monte-Carlo based optimization method. In order to show the efficacies of the proposed method, a numerical example has been designed, and further analyses on solutions have been conducted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.