Abstract

In-house part supply affects the efficiency of mixed-model assembly lines considerably. Hence, we propose a reliable Just-In-Time part supply strategy with the use of decentralized supermarkets. For a given production sequence and line layout, the proposed strategy schedules tow train routing and delivery problems jointly to minimize the number of employed town trains and the traveling time, while ensuring that stations never run out of parts. To solve this problem, a mathematical formulation is proposed for each sub-problem aiming at minimizing supply cost. Then, a dynamic programming algorithm for routing and a greedy algorithm for delivery are developed, both of which are of polynomial runtime. Finally, a computational study is implemented to validate the effectiveness of the strategy, and to investigate the effects of the delivery capacity of tow trains and storage capacity of stations on supply cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.