Abstract

In April 2004, a scanning tour of Japan, the Netherlands, Belgium, Germany, and France was made to obtain information about bridge construction methods being used to minimize traffic disruption, improve work zone safety, minimize environmental impact, improve constructibility, increase quality, and lower life-cycle costs. From information obtained from the tour, 10 technologies were identified for further consideration and possible implementation into U.S. practices. These included two technologies that allow bridges to be built off site and then moved to their final location in a short time, three superstructure systems and four deck systems that facilitate faster and safer construction, and one substructure system. The two technologies for moving bridges were self-propelled modular transporters and other moving systems, including skidding or sliding, incremental launching, floating, rotating, and lifting of bridges into place. The superstructure systems included a precast concrete deck system known as t...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call