Abstract
Twenty buildings and 14 precast concrete parking structures make up the new Sprint World Headquarters in Overland Park, Kansas. Creating such a massive complex required close communication among trades and coordination of all design elements. The parking structures were designed using two basic plans, for a three- and four-bay layout, with the only variation coming in ramp access and first-floor designs due to the sloping grade across the campus. The design used pocketed spandrels to eliminate ledges around the structures' perimeters and clean, simple finishes with ribbed details to add interest. The 14 parking structures were completed in slightly more than three years. This article presents the design considerations and construction highlights of the project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.