Abstract
BackgroundThere are variable practices in the management of the parenteral nutrition (PN) process in hospitals having a neonatal intensive care unit (NICU). In our hospital, PN is prepared partially on the neonatal ward by nurses but also at the central pharmacy by trained pharmacy technicians. A previous study showed a concentration non-conformity of 34% of on-ward PN preparations potentially resulting in under- or overfeeding of the patients.ObjectiveThe objectives were to perform preliminary risk analyses (PRA) in preparation for our hospital’s transition to universal central pharmacy PN compounding.MethodsA working group including pharmacists, neonatologists, nurses, and pharmacy technicians performed two PRA. The risks of 9 management steps of the PN process were identified, evaluated, and quoted. A comparison of the number of risks and their criticality index (CI) was conducted.ResultsA total of 36 and 39 risks were identified for PN preparation in the NICU and the pharmacy, respectively. For the NICU, ten risks (28%) had an “acceptable” CI, 15 risks (42%) were “under control” and eleven (31%) were defined as “non-acceptable”. For the pharmacy, 14 risks (36%) had an “acceptable” CI, 19 risks (49%) were “under control” and six (15%) were defined as “non-acceptable”. Risks directly related to the preparation process, including the steps preparation hood, PN preparation and analytical quality control, represented a cumulated CI of 145 for eleven NICU-risks vs 108 for twelve pharmacy risks (−26%). The implementation of immediate improvement measures, eg, an electronic prescription form, reduces the total CI by 5.7% and 2.2% for the NICU and the pharmacy, respectively.ConclusionThis PRA highlighted the safety differences between PN preparation in the NICU vs the pharmacy at our institution, and facilitated our moving forward with a process change that should improve the care of our neonatal patients. Nevertheless, long-term improvement measures have to be implemented to further reduce risks related to the PN management process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.