Abstract

High-end manufacturing systems are cyber-physical systems, where productivity depends on the close cooperation of mechanical (physical) and scheduling (cyber) aspects. Mechanical and control constraints impose minimal and maximal time differences between events in the product flow. Sequence-dependent constraints are used by a scheduler to optimize system productivity while satisfying operational requirements. The numerous constraints in a schedule are typically related to a relatively small set of parameters, such as speeds, lengths, or settling times. We contribute a parametric critical path algorithm that identifies bottlenecks in terms of the feasible parameter combinations. This algorithm allows analysis of schedules to identify bottlenecks in terms of the underlying cause of constraints. We also contribute a way to find Pareto-optimal cost-performance tradeoffs and their associated parameter combinations. These results are used to quantify the impact of relaxing constraints that hinder system productivity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.