Abstract

Based on the precast pile foundation field test of the power plant, the distribution and dissipation of the excess pore water pressure induced by the construction of the precast pile are first analyzed after the plastic drain board driven in the soft ground. Then the influence factors of the distribution and dissipation of the excess pore water pressure are presented. Subsequently the quality problem of the pre-date driven pile caused by the construction of the precast pile is studied. The main control parameters of the precast pile construction under the complicated condition are provided, which will provide a reference for such similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.