Abstract

This article considers scheduling products in a parallel, non-identical machine environment subject to sequence-dependent setup costs and sequence-dependent setup times, where production waste and processing time of a product depend on feasible machine assignments. A Mixed-Integer Programming (MIP) formulation is developed that captures trade-offs between overtime labor costs and waste costs. Two solution procedures are developed to address large problem instances. One procedure is an algorithm that determines a vector of product-to-machine assignments that assists an MIP solver to find an initial feasible solution. The second procedure is a decomposition heuristic that iteratively solves a relaxed subproblem and uses the subproblem solution to fix assignment variables in the main MIP formulation. In addition, bounds on the quality of solutions found using the decomposition heuristic are presented. Experiments are conducted that show the developed formulation outperforms more traditional scheduling objectives with respect to the waste and overtime labor costs. Additional experimentation investigates the effects that problem parameter values have on total waste and labor costs, performance of the approaches, and the use of overtime labor.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.