Abstract

The Resource-Constrained Project Scheduling Problem (RCPSP) is a well-known scheduling problem aimed at minimizing the makespan of a project subject to temporal and resource constraints. In this paper we show that hard RCPSPs can be efficiently tackled by a portfolio approach that combines the strengths of different constraint solvers Our approach seeks to predict and run in parallel the best solvers for a new, unseen RCPSP instance by enabling the bound communication between them. This on-average allows to outperform the oracle solver that always chooses the best available solver for any given instance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.