Abstract

We consider the problem of scheduling unit-length jobs on identical parallel machines such that the makespan of the resulting schedule is minimized. Precedence constraints impose a partial order on the jobs, and both communication and precedence delays impose relative timing constraints on dependent jobs. The combination of these two types of timing constraints naturally models the instruction scheduling problem that occurs during software compilation for state-of-the-art VLIW (Very Long Instruction Word) processors and multiprocessor parallel machines.We present the first known polynomial-time algorithm for the case where the precedence constraint graph is a forest of in-trees (or a forest of out-trees), the number of machines m is fixed, and the delays (which are a function of both the job pair and the machines on which they run) are bounded by a constant D.Our algorithm relies on a new structural theorem for scheduling jobs with arbitrary precedence constraints. Given an instance with many independent dags, the theorem shows how to convert, in linear time, a schedule S for only the largest dags into a complete schedule that is either optimal or has the same makespan as S.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.