Abstract

Scheduling problems occurring in parallel machines manufacturing environments are quite usual and many different methods have been applied for solving it. These methods vary from the application of more or less simple heuristics and rules up to more complex methods, including distinct kind of metaheuristics. In this paper we discuss a fuzzy optimization method using simulated annealing (Fuzzy-SA) for solving an unrelated parallel machines manufacturing scheduling problem. To demonstrate the potential of our method we use an illustrative example of a parallel machines scheduling (PMS) problem and then we analyse it and perform statistical tests with 20 instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.