Abstract
We consider a problem of scheduling n independent jobs on m parallel identical machines. The jobs are available at time zero, but the machines may not be available simultaneously at time zero. We concentrate on two goals separately, namely, minimizing a cost function containing total completion time and total absolute differences in completion times; minimizing a cost function containing total waiting time and total absolute differences in waiting times. In this paper, we present polynomial time algorithm to solve this problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have