Abstract
We analyse a parallel (identical) machine scheduling problem with job delivery to a single customer. For this problem, each job needs to be processed on $m$ parallel machines non-pre-emptively and then transported to a customer by one vehicle with a limited physical capacity. The optimization goal is to minimize the makespan, the time at which all the jobs are processed and delivered and the vehicle returns to the machine. We present an approximation algorithm with a tight worst-case performance ratio of $7/3-1/m$ for the general case, $m\geq 3$.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.