Abstract

Two problems involving the assignment of men to jobs, in a production system with parallel lines, to maximize the steady state system production rate are studied. In the first, in which a man's production rate is independent of the line to which he is assigned, a simple rule “group the fastest men in the same line” is shown to be optimal. In the second, in which production rates are dependent on the production line, an algorithm is developed to obtain a solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.