Abstract

Palm oil industries have products like Crude Palm Oil (CPO), and 70% of others contain waste. One of the wastes is the liquid waste known as Palm Oil Mill Effluent (POME). The potential of POME to be reprocessed into clean water will be profitable. One of POME's reprocessing methods is the Sequencing Batch Reactor with Aerobic Granulated Sludge (SBR-AGS), which has five main phases: filling, idling, aeration, settling, and discharge, with a cycle time of 360 minutes. The first step in using this reactor is the start-up process, a granule-forming process from some sludge that has already acclimatized. In one complete cycle, the Oxidation-Reduction Potential (ORP) parameter is used to observe the electron transfer process that shows the oxygen supply into the reactor, which enables the condition of each phase in the process to be analyzed. The trend of ORP value is constantly changing in every phase. For the idling phase, the ORP tends to decrease in a value of (-300)-(-400) mV, and for the aeration phase, it will increase in a value of (-100)-100 mV.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.