Abstract

In this paper, we examine the packet routing problem for networks with wires of differing length. We consider this problem in a network independent context, in which routing time is expressed in terms of "congestion" and "dilation" measures for a set of packet paths. We give, for any constant ϵ > 0, a randomized on-line algorithm for routing any set of N packets in O((C lgϵ(Nd) + D lg(Nd))/lg lg(Nd)) time, where C is the maximum congestion and D is the length of the longest path, both taking wire delays into account, and d is the longest path in terms of number of wires. We also show that for edge-simple paths, there exists a schedule (which could be found off-line) of length O((cdmax + D) (lg(dmax)/lg lg (dmax))), where dmax is the maximum wire delay in the network. These results improve upon previous routing results which assume that unit time suffices to traverse a wire of any length. They also yield improved results for job-shop scheduling as long as we incorporate a technical restriction on the job-shop problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.