Abstract

The post-ozone plant at Wiggins waterworks was commissioned during 1984. The main objective of the post–ozone plant was to ensure proper disinfection, including the elimination of viruses, whenever raw water for the works was pumped from the polluted lower Umgeni River. The main problems experienced with the post–ozone plant were poor ozone transfer efficiency in the contact tank and poisoning of the catalyst in the thermal-catalytic destructor.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call