Abstract

One of the main problems in EHV and UHV systems is the control of transient overvoltages of internal origin. The first part of this paper investigates different approaches to limit over- voltages due to line energization and reenergization; the second part deals with fault and fault-clearing overvoltages. Finally, the relative severity of the former type of overvoltage versus the latter in EHV and UHV systems is compared.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.