Abstract

The article presents examples of the use of portable bridge structures in civil engineering. Due to the possibility of combining elements of these structures into a variety of complex spatial arrangements, they could be widely used. Various technologies and principles of organisation of the construction of engineering structures of pre-fabricated bridges are presented. The presented solutions are both technologies known and used since the beginning of the history of panel bridges, as well as new technologies, developed on the basis of practical experience of engineers. The article presents selected scientific principles of work organisation, influencing the maintenance of a high rate of implementation of the construction project. The article also analyses the influence of location conditions, different from typical standard assembly stations, on the technology and organization of construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call