Abstract

The BATMAN Upgrade (BUG) test facility at IPP is contributing to the development of RF-driven H- sources towards the ITER neutral beam injection and beyond. BUG is equipped with an 1/8 size of the ITER NBI ion source and thus is highly flexible for setup changes or diagnostic access. The present strategy for BUG is aligned along two paths: (i) BUG is continuing to be upgraded upgrading for long pulse operation (up to 1 hour, both in H and D) to identify measures for the stabilization of long pulses. For pulses > 100 s a cooling of the plasma grid (first grid of the extraction system) is required in order to avoid the dominance of thermal Cs desorption. A Cs evaporation concept with evaporation close to the extraction system is being tested, showing a stabilization of co-extracted electrons in 100 s H pulses, (ii) BUG is used for investigations of whole beam and beamlet optics for which the beam diagnostics have been massively upgraded. The beam diagnostics have been used to characterize a newly installed MITICA-like extraction system including asymmetric deflection compensation magnets.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.