Abstract

Materials degradation phenomena, if not appropriately managed, have the potential to adversely impact the design functionality and safety margins of nuclear power plant (NPP) systems, structures and components (SSCs). Therefore, the U.S. Nuclear Regulatory Commission (NRC) has initiated an over-the-horizon multi-year research Proactive Management of Materials Degradation (PMMD) Research Program, which is presently evaluating longer time frames (i.e., 80 or more years) and including passive long-lived SSCs beyond the primary piping and core internals, such as concrete containment and cable insulation. This will allow the NRC to (1) identify significant knowledge gaps and new forms of degradation; (2) capture current knowledge base; and, (3) prioritize materials degradation research needs and directions for future efforts. This effort is being accomplished in collaboration with the U.S. Department of Energy’s (DOE) LWR Sustainability (LWRS) program. This presentation will discuss the activities to date, including results, and the path forward.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.