Abstract

Mine scheduling at Oyu Tolgoi (OT) Underground Project is centred on executing the perfect shift. This paper will outline the best practice mine scheduling process used at OT with an overview of the structure and mechanics. Scheduling commences by the Mine Planning and Technical team offsite with plans transitioned to site for detailing in the three-month execution space. Mine development scheduling involves developing a build-up of activities that represent the latest mine design. The development tasks cover a range of ground support profiles based on life-of-mine requirements for the excavations and ground conditions, with task rates developed from first principles. Simulation is used to validate and test these rates in the schedule. The schedule is resource levelled, taking into account mine priorities, a calendar of working hours and system constraints. The schedule is integrated with construction planning through a number of defined interface points. Following this, plans are submitted to the Integrated Planning Process (IPP) where additional conflicts are identified and resolved. This paper will demonstrate how at OT, the mine planning process is structured and integrated with the whole project to ensure competing priorities are evaluated equally across the project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.