Abstract

<abstract> <p>Even though hydropower plants are currently the most dominant source of electricity in Uganda, the rate of development of these resources for power generation remains low. Using a semi-systematic review approach, this paper seeks to understand why there is a slow rate of hydropower development in Uganda (challenges) and thereby provide potential solutions to these challenges. With current total capacity of about 1011 MW, findings indicate that there is a higher future prospect for hydropower generation in Uganda, with an estimated potential of over 4500 MW. In terms of number of projects, small-scale hydropower plants dominate power plants in Uganda, currently accounting for 19 out of 35 grid-connected power plants. However, with 855 MW installation capacity, large hydropower plants dominate the power generation plants landscape in Uganda. This study found that the challenges to hydropower development in this country are multi-dimensional including technical, economic, environmental, and social factors, and shows that the cross-cutting challenge is lack of human capacity that possess adequate skills to handle hydropower projects in the country. Furthermore, this study discussed practical solutions to address the identified problems facing hydro power in Uganda.</p> </abstract>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call