Abstract

With the development of power system, the main unit is gradually becoming larger and larger, thus length of time that large generators after experiencing disturbances in power grid needed to adjust and maintain the stability is more important than ever. Generator out-of-step prediction which is a part of security and automaticity equipment of power system, sends out the corresponding operation instructions in order to keep the whole system stay stability, according to the initial system state and fault severity. The paper analyzes and classifies several schemes and principles on generator out-of-step prediction. The actual advantages and disadvantages are pointed out. At last, the development of out-of-step prediction is also presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.