Abstract

This paper briefly introduces the present situation of concrete filled steel tube (CFST) arch bridges in China. More than 200 CFST arch bridges were investigated and analyzed based on the factors of type, span, erection method, geometric parameters, and material. Some key issues in design calculation were presented, such as check of strength, calculation of section stiffness, and joint fatigue strength. It will provide a comprehensive reference of CFST arch bridges for the bridge designers and builders.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.