Abstract

This overview was written primarily with graduates, engineers and electrical, mechanical, chemical, instrumentation and control and computer technicians in mind who wish to enter the power generation industry at large and gas turbine power generating plants in particular, since combined cycle gas turbine power plants constitute the largest output and most efficient turbine power generation stations operating today. This Part 4 of a four part overview focuses on the salient asset management (O&M) aspects of generator and exciter plant in both open cycle and combined cycle gas turbine power stations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.