Abstract
Based on the theory of risk analysis, this study develops a LHS –MC method to evaluate dam overtopping probability that accounts for the uncertainties arising from wind speed and peak flood. LHS method is used to generate samples of peak flow rate and wind speed especially for rare events. One example of dam overtopping risk analysis is presented to demonstrate the validity and capability of the proposed method. By means of numerical example, it is shown that LHS method is efficient which tends to convergence within a few simulation times. Reservoir routing, which incorporates operation rules, wind setup, and run-up, is used to evaluate dam overtopping probability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.