Abstract

In the field of industry, especially in the production areas, it is particularly important that the monitoring of assembly efficiency takes place in real-time mode, and that the related data-based estimation also works quickly and reliably. The Manufacturing Execution System (MES), Enterprise Resource Planning (ERP) and Customer Relationship Management (CRM) systems used by companies provide excellent support in data recording, processes, and storing. For Overall Equipment Effectiveness (OEE) data showing the efficiency of assembly lines, there is a regular need to determine expected values. This paper focuses on OEE values prediction with Multiple Linear Regression (MLR) as supervised machine learning. Many factors affecting OEE (e.g., downtimes, cycle time) are examined and analyzed in order to make a more accurate estimation. Based on real industrial data, we used four different methods to perform prediction with various machine learning algorithms, these were the cumulative, fix rolling horizon, optimal rolling horizon and combined techniques. Each method is evaluated based on similar mathematical formulas.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call