Abstract

Purpose Although prior research provides evidence that production ramp-up is often disrupted by supplier-related problems, it fails to discuss how the original equipment manufacturer (OEM) and various types of suppliers integrate their functions and operations to secure preparations for production ramp-up. The purpose of this paper is to investigate OEM–supplier integration in a new product development (NPD) project to prepare for production ramp-up. Design/methodology/approach The results presented in this paper are based on a real-time, longitudinal study of a single collaborative NPD project in the mechanical engineering industry. The NPD project involves seven suppliers and it is carried out in a large Swedish company (the OEM) and fits the theory-elaborating approach of this research. Findings This study argues that the aspect of timing in OEM–supplier integration, the OEM’s research and development (R&D) attitude toward collaboration and the OEM’s (R&D) operating procedure are challenges affecting the preparation for production ramp-up. The following three mechanisms to facilitate OEM–supplier integration in order to prepare for production ramp-up are also discussed: the mediator’s role, the OEM’s face-to-face meeting at the project level and suppliers’ formal face-to-face meetings with the OEM and internally. Originality/value This paper elaborates on and extends prior research on production ramp-up by conducting an empirical analysis that incorporates supplier integration in NPD. It bridges the gap between the literature on production ramp-up and on supplier integration in NPD and clearly indicates that supplier integration is an important prerequisite for successful production ramp-up.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call