Abstract

Purpose of this article is to describe the construction methods of the pre inspection facilities subject information. The technique is based on a field of objects in-formatyzatsiyi. Pre-installation inspection is performed a dedicated working group consisting of representatives of an organization involved in the survey, and key employees of the customer survey. Information gathering can be done by different methods, different levels of formalization. These methods include surveying, product tour, keeping a diary of work, photographing working hours etc. Based on the selected research methods are selected methods of collecting materials inspection stages and ways to use them. Materials Processing examination performed in accordance with procedures developed by the survey. After gathering information about the object of the survey carried out by its processing, synthesis and analysis. The result is based methodology will formalize the process of pre inspection of railway stations and junctions, improving the processes of interaction between artist and customer to raise the quality and reliability of the collected information, to reduce the cost of work on the stage of learning process station or node

Highlights

  • Целью статьи является описание построения методики проведения предпроектного обследования объекта, подлежащего информатизации

  • The technique is based on a field of objects in-formatyzatsiyi

  • Pre-installation inspection is performed a dedicated working group consisting of representatives of an organization involved in the survey, and key employees of the customer survey

Read more

Summary

Introduction

Целью статьи является описание построения методики проведения предпроектного обследования объекта, подлежащего информатизации. The result is based methodology will formalize the process of pre inspection of railway stations and junctions, improving the processes of interaction between artist and customer to raise the quality and reliability of the collected information, to reduce the cost of work on the stage of learning process station or node. Метою статті є розробка методики виконання передпроектного аналізу функціонування залізничних станцій та вузлів, що виконується на етапі обстеження об’єктів автоматизації та обґрунтування необхідності створення і впровадження на цих об’єктах автоматизованих систем керування на стадії формування вимог до таких систем.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.