Abstract

This article deals with the importance of simulation studies for the reliability of wind farm (WF) equipment during the operation process. Improvements, upgrades, and the introduction of new solutions that change the reliability, quality, and conditions of use and operation of wind farm equipment present a research problem during study. Based on this research, it is possible to continuously evaluate the reliability of WF equipment. The topic of reliability testing of complex technical facilities is constantly being developed in the literature. The article assumes that the operation of wind farm equipment is described and modeled based on Markov processes. This assumption justified the use of Kolmogorov–Chapman equations to describe the developed research model. Based on these equations, an analytical model of the wind farm operation process was created and described. As a result of the simulation analysis, the reliability of the wind farm was determined in the form of a probability function (R0(t)) for the WPPs system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call