Abstract
In design phases of large and complex infrastructure projects, a main challenge is to coordinate numerous technical specialists. Heuristics, or cognitive rules of thumb, is one factor that may influence the development of organisational structures and routines, especially if project management discretion is high. A longitudinal case study, comprising non-participant observation over three years, was carried out of the early design phase of a major railway tunnel project. Availability and familiarity heuristics were found important, as well as coordination neglect — a general tendency to focus more on partitioning tasks than on coordination needs. Satisficing, meaning that the first acceptable organising solution is selected and retained, was found to be strong in temporary, transitory contexts. Shared heuristics were manifest as short catchphrases, or mantras. Clients should develop meta-routines and meta-functions to support adaptation within, and learning between, projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.