Abstract

The preparation of radioactive targets requires extensive precautions to protect laboratory staff as well as the environment from radiation damage and contamination. In the new hot-lab facility of the University of Munich, which is currently under construction, the technical equipment for target production will be integrated in a health physics system which meets these conditions in a very satisfactory way. Some details of the layout and the organisation of the laboratory will be given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.