Abstract

This document presents the organisation of the low voltage (LV) and medium voltage (MV) live work (LW) at Enedis, and the differentiated management of the professionalism of the operators between these two voltage levels.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call