Abstract
We consider the problem of planning future order releases in hierarchical production planning and control systems. An established research direction is the clearing function concept: the planned material flow through a production unit is modelled by inventory balance equations for WIP and final products, and the consequences of the stochastic properties of the material flow are modelled by clearing functions, which is the functional relationship between the level of WIP and the maximum output of a work centre in a period. Using a transient M/M/1 model, our paper shows that the usual definition of a nonlinear clearing function suffers from substantial shortcomings concerning both the definition of the function and empirical estimation of its parameters. We propose an alternative transient clearing function and derive a procedure for its parameterization.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.