Abstract

Turbulent markets have led to changes in the manufacturing area which paved the way for new concepts and planning approaches. The paper deals with a planning problem which is specific to the semiconductor industry. The conventional planning procedure according to which resources are planned with constant lead times for given planning periods presents a real dilemma for semiconductor manufacturer. One way out of this dilemma is the use of rough planning methods with variable lead times. This article describes such a procedure based on an iterative planning concept using artificial neural networks to calculate the variable lead times.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.