Abstract

In the near future, a smart grid will accommodate customers who are prepared to invest in generation-battery systems and employ energy management systems in order to cut down on their electricity bills. The main objective of this paper is to determine the optimum capacity of a customer's distributed-generation system (such as a wind turbine) and battery within the framework of a smart grid. The proposed approach involves developing an electricity management system based on stochastic variables, such as wind speed, electricity rates, and load. Then, a hybrid stochastic method based on Monte Carlo simulation and particle swarm optimization is proposed to determine the optimum size of the wind generation-battery system. Several sensitivity analyses demonstrate the proper performance of the proposed method in different conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.