Abstract

Establishing a gain/pain sharing arrangement tailored to a project's delivery method is regarded as being essential for achieving a project's goals. However, no guidelines exist in the literature on what the sharing arrangement should be for different delivery methods. The paper is a first in dealing with optimal sharing arrangements within project delivery methods. The paper shows for the delivery methods considered, assuming cooperative behaviour: the proportions of the optimal gain/pain sharing to the contractor and design consultant are affected by the owner, contractor, and design consultant levels of risk aversion; the choice of delivery method has no effect on the optimal sharing to the design consultant; however, the delivery method used affects the optimal sharing to the contractor. A designed exercise is used to validate the paper's propositions. For application purposes, in both delivery methods, recommended sharing proportions to contractors and design consultants are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.