Abstract

A method is developed for selecting the number and location of additional exploratory boreholes using an iterative procedure based on a mathematical optimization concept called fixed point theory. The method is illustrated through its application to an exploratory drilling program for a coal mine where optimized locations gave a lower estimate of regional and block variances than the manual choice.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.