Abstract

Today’s business world is facing a plethora of managerial and technological changes which are beyond the capacity of any firm to control or absorb. Customer satisfaction, development of new products, and introduction of new technologies are well‐known driving forces, but their fast mutation and turmoil are making them unpredictable. Companies have to radically alter their strategic and process goals to keep up with this volatile market. In this turbulent environment, business process reengineering (BPR) has evolved as the most promising approach for designing organizations. It is extremely important for reengineers to understand the “driving” forces in this environment. One of the most important and fundamental drivers is understanding the goals (goal mapping) of the organization. Typically the goals of organizations are derived from the “voice of the customer”. In this paper we address a procedure by which optimum level of goal mapping can be considered in the preliminary stages of BPR. A cost optimization model for goal mapping is proposed using an example from the Space Shuttle Testing Facility at the SSC‐National Aeronautics and Space Administration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.