Abstract

This study presents the formulation of an optimum design of smooth blasting using a manual drilling machine in hard-rock tunnelling and the cost estimation of overbreaking and underbreaking. The proposed design method aims to minimize the total expense of the extra concrete cost in the region of overbreaking and of the labour cost required to remove the unbroken rock in the region of underbreaking. The design variables is the collaring radius ΔR only. The calculated results indicate that the drilling precision of the look-out angle is the most important factor in the optimum design of smooth blasting in tunnelling, in the case of using a manual drilling machine. The results also indicate that 40% of the total expense can be saved by the improvement of drilling precision and the application of an optimum design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.