Abstract

Suitable protection system is a must to protect people and primary electric power equipment from disaster or damage. Most frequent faults that occur in the distribution system are overcurrent faults. Overcurrent (OC) relays are used significantly in protecting power distribution system from frequently caused faults like short circuits, ground faults, etc. Optimization algorithms maybe used to minimize the time of operation of relays. This paper implements Big M and Revised Simplex method for optimum time coordination of overcurrent relays in a distribution network and identifies the optimized time multiplier setting (TMS) of the relay. This helps in quick coordination of overcurrent relays and also fast fault clearance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call