Abstract

The charge plan is a basic problem of the metallurgical industry. Through a comprehensive consideration of the process constraints and production costs, charge plan is a typical multi-objective optimization problem. A multi-objective optimization model of charge plan was built in this paper. As direct encoding is hard to be used in the many constraints problem case, a new method of generate feasible solutions based on constraint satisfaction was proposed. A novel adaptive grid algorithm was also proposed to improve the current multi-objective evolutionary algorithm’s population maintain strategy. Finally, the proposed multi-objective charge plan model was solved, and more meaningful solutions for this problem were obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.