Abstract

Motivated by the practical scheduling problem of job shops, this study evaluates unrelated parallel machine scheduling models. The researchers proposed a new mixed integer linear programming model considering effects of maximum limit on the allowable tardiness. An efficient solution technique was developed in MATLAB to minimise computational time. The model was validated using real-life data from local aircraft industry. It was shown that the proposed model leads to lower cost compared to the current models (i.e., without any limit on tardiness) in the literature. In addition, reduction in computational time enables corporate scheduling staff to use the model efficiently.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.